BEED EngineeringBEED Engineering

Engineering Project

Oviedo High School Renovations

  • Oviedo, Florida
  • 400,000 SF
  • Education / Institutional
  • Mechanical + Plumbing Engineering

BEED Engineering

Education

Oviedo High School

Oviedo, Florida · Mechanical + Plumbing Engineering

Project Overview

Oviedo High School in Oviedo, Florida is a 400,000-square-foot campus with classrooms, offices, a gymnasium, dining hall, kitchen, auditorium, automotive workshop, and ancillary spaces. BEED Engineering provided mechanical and plumbing engineering design and project administration for renovations to that campus.

A high school of this size is a small district energy plant as much as it is a school. Four 300-ton centrifugal water-cooled chillers, cooling towers, and primary-secondary pumping serve the renovated floor area.

The Challenge

Classrooms, a gym, an auditorium, a kitchen, and an automotive workshop do not share one HVAC profile. The renovated plant had to cool all of them and still serve kitchen grease waste, hood exhaust, and vehicle exhaust in the shop.

The design had to:

  • Provide four 300-ton centrifugal water-cooled chillers with primary-secondary pumping and cooling towers
  • Serve occupied spaces with variable air volume air-handling units and pressure-independent air terminals
  • Include HVAC controls, kitchen hood exhaust, grease traps, and vehicle exhaust
  • Specify water-efficient plumbing fixtures and high-efficiency instant gas-fired water heaters

BEED Engineering's Scope

BEED provided mechanical and plumbing engineering design and project administration. Electrical engineering was not listed as part of this assignment.

Engineering Solutions

The water-cooled plant uses four 300-ton centrifugal chillers, cooling towers, and primary-secondary chilled-water pumping. Variable air volume air-handling units with pressure-independent terminals distribute cooling to classrooms, offices, gym, dining, auditorium, and related spaces. HVAC controls coordinate that plant.

Kitchen hood exhaust and grease traps serve dining and food service. Vehicle exhaust serves the automotive workshop. Water-efficient plumbing fixtures and instant gas-fired water heaters complete the plumbing design for the renovated 400,000-square-foot campus.

Related BEED Services

Related Locations

Related Resources

Related Projects

Local Presence

BEED Engineering — Based in Palm Bay, Serving Central Florida

BEED Engineering is an MBE professional consulting engineering firm providing building mechanical, electrical, and plumbing (MEP) engineering design and consulting services. We are based in Palm Bay, Central Florida. BEED Engineering is a firm you can trust to get the job done.

Next Project

Have a Similar Engineering Project?

Talk with BEED Engineering about your next mechanical, electrical, plumbing, or education building systems project.