Commercial generators start on a utility outage, produce electricity, and feed selected building loads through automatic transfer switches.

Reviewed by

Michael K. Frempong, PE, LEED AP BD+C

President & Principal Engineer, BEED Engineering

Michael is a professional engineer and LEED AP BD+C accredited professional with more than 20 years of consulting engineering experience. He leads BEED Engineering's mechanical, electrical, and plumbing design work for commercial, healthcare, laboratory, education, industrial, and other building projects throughout Central Florida and the Treasure Coast.

View BEED team profile

Quick Answer

A commercial generator is an on-site engine-driven power source that starts when utility power fails. An automatic transfer switch disconnects the normal source and connects selected loads to the generator. The system is designed around which loads must remain on—life safety, critical operations, or broader standby needs—and how long the generator must run.

What happens during an outage

  1. Utility power is lost.
  2. The automatic transfer switch (ATS) senses the outage.
  3. The generator starts and reaches acceptable voltage and frequency.
  4. The ATS transfers selected loads to the generator.
  5. When utility power is stable again, the ATS transfers back and the generator cools down.

That is the practical core of emergency power.

What the engineer designs

  • Load list and load calculation
  • Generator sizing, including starting of motors
  • ATS arrangement
  • Fuel system and runtime
  • Exhaust, ventilation, and sound
  • Distribution of emergency versus optional standby loads
  • Interface with fire alarm and building automation

Emergency versus standby

Life-safety loads (egress lighting, fire alarm, some elevators) follow stricter rules than optional standby loads (convenience cooling, selected receptacles). Mixing them casually creates code and operational problems.

Florida considerations

Coastal wind, flood elevation, fuel availability after storms, and owner expectations after hurricanes all influence placement and capacity. See electrical engineering in Brevard County and Treasure Coast MEP.

When to involve an engineer

Involve an engineer before purchasing a generator. The machine has to match the load, the ATS, the code path, and the physical site.

Common Questions

Will a generator power the entire building?

Only if it is sized and connected that way. Many systems serve a defined emergency or standby load, not every receptacle.

Do generators need fuel storage and exhaust design?

Yes. Fuel type, tank location, exhaust, combustion air, and sound all require coordinated mechanical and electrical design.

Filed under Electrical Engineering

Continue exploring

Related Questions

Related BEED Services

Related Locations

Service Area

Serving Central & South Florida

BEED Engineering is based in Palm Bay and serves building projects throughout Brevard County, the Treasure Coast, Port St. Lucie, Orlando, and surrounding areas.

Need Engineering Help?

Planning a generator or backup power project?

BEED Engineering designs generator systems, transfer equipment, and emergency distribution for commercial and institutional buildings.

Discuss Your Project